Spectrally™ places a Raman probe directly into your ATS, KTS/CaTS, and AMS stream — inline, meaning within the absorption stream, pipeline, or tank itself, with no sampling required. Thiosulfate concentration, N/S ratio, and solution homogeneity are measured in seconds, continuously, without reagents, replacing the 20- to 60-minute wait for iodometric titration or ion chromatography.
Ammonium, potassium, and calcium thiosulfate, plus ammonium sulfate — the aqueous sulfur-fertilizer streams produced by gas absorption.
The parameters that define the product — read in real time rather than inferred after the batch.
Thiosulfate and sulfate are strong Raman-active oxyanions, and water is a weak Raman scatterer — so Raman measures them cleanly inline.
An immersion probe in the absorption stream, pipeline, or tank, continuously feeding your PLC / DCS.
Six focused pages: the chemistries we cover, the parameters we read, how the measurement works, the technical rationale behind it, the regulatory context, and the instrument itself.
Iodometric thiosulfate titration yields results in 20 to 30 minutes; full anion analysis by ion chromatography takes 30 to 60 minutes; densitometry serves only as a concentration proxy and never reveals composition. The absorption process runs continuously, so by the time the result is available, the stream has moved on.
Sample, walk to the lab, run iodometric titration or ion chromatography, wait, report. A deviation in thiosulfate concentration or N/S ratio only surfaces as an off-spec delivery at your customer — after the product has shipped, where it becomes a complaint and a CE-certification issue.
The probe reads the absorption stream, pipeline, or tank continuously and streams thiosulfate concentration, N/S ratio, and homogeneity to your control system. The deviation is caught while you can still correct it — so titration and ion chromatography become verification, not the bottleneck.
Spectrum to a process value, continuously.
Composition resolved down to single ppm.
System CAPEX: 75 to 250k EUR — no reagents, no consumables.
Typical timeline from feasibility to line: 3 to 5.5 months.
Send representative samples or process data from your ATS, KTS/CaTS, or AMS stream. We build and validate a chemometric model on your matrix and show you exactly what inline Raman would read on your line — before any commitment. Your feasibility study puts the numbers on the table: the validated model and the figures for your own material.
We use cookies to ensure the site functions properly, measure traffic, and personalize marketing only with your consent.